Design and construction of a fully integrated building to house a modern metal stamping plant for one of Melbourne's leading manufacturers


Carron Concrete Services was engaged by Dana to design and construct a fully integrated building for this futuristic metal stamping plant, one of Melbourne’s leading manufacturers. This industrial building project involved creating a 1200 square meter building, standing 15 meters tall, with a foundation pit meters in depth. The building structure includes crane rails for a twin 25-tonne crane with a 30-meter bridge span. The site posed significant challenges as it is in saturated sand with ground water at 900-mm. Despite these obstacles, our team expertly managed the construction, completed the project on time and within budget.

The images depict the construction of the press pit, the erection of structural steel and 30-tonne panels, and the installation of the scrap conveyor and press.