Visit the all new office and depot at 18 Elma Road Cheltenham.
Carron Concrete Services was engaged by Dana to Design and Construct a fully integrated Building for this futuristic metal stamping plant. The new building is 1200 square meters in area, 15 meters in height, and a foundation pit 6 meters in depth. The building structure has crane rails for a twin 25 tonne crane of 30 meter bridge span. The site provided challenges for below ground construction as it is in saturated sand with ground water at 900-mm. Carron Concrete services completed the project on time and on Budget.
Scrap conveyor,and installation of press.
Carron Concrete Services was engaged by Dana to Design and Construct a fully integrated Building for this futuristic metal stamping plant. The new building is 1200 square meters in area, 15 meters in height, and a foundation pit 6 meters in depth. The building structure has crane rails for a twin 25 tonne crane of 30 meter bridge span. The site provided challenges for below ground construction as it is in saturated sand with ground water at 900-mm. Carron Concrete services completed the project on time and on Budget.
Structural steel,site cast Tilt up panels 30 tonnes each,
Carron Concrete Services was engaged by Dana to Design and Construct a fully integrated Building for this futuristic metal stamping plant. The new building is 1200 square meters in area, 15 meters in height, and a foundation pit 6 meters in depth. The building structure has crane rails for a twin 25 tonne crane of 30 meter bridge span. The site provided challenges for below ground construction as it is in saturated sand with ground water at 900-mm. Carron Concrete services completed the project on time and on Budget.
The following are phots of the construction of the press pit.
Carron Concrete Services was engaged by Dana to Design and Construct a fully integrated Building for this futuristic metal stamping plant. The new building is 1200 square meters in area, 15 meters in height, and a foundation pit 6 meters in depth. The building structure has crane rails for a twin 25 tonne crane of 30 meter bridge span. The site provided challenges for below ground construction as it is in saturated sand with ground water at 900-mm. Carron Concrete services completed the project on time and on Budget.
Following photos show Demolition and installation of secant pile for 6meter deep foundation pit.
Tight squeeze for 100 tonne crane to leave site after erecting on site tilt up panels for 2 level office building in Richmond.
A good operator, hydralic suspension and crab steering makes it possible.
Under pinning to neighbours complete. blinding concrete poured, preparing base slab.
Construction of 6 meter deep pit in unstable saturated sand with water table at 1.2 meters below ground level. No worries, we have the solutions as these photos show.
Building an upside down pit. Construct the top 3 meters before you excavate the bottom 3 meters.
No sign of water in pit, the de-watering working fine. After base is poured and cured, the pumps are turned off and the pit was water tight.
Sheet metal slitting & cropping line machine foundation for Toyota.
Excavation completed & pouring of 600 mm blinding concrete layer with super plasticiser.
























































Comments
can u plz tell me wat grade of concrete and steel ...
hemant on Sheet metal slitting & cropping line machine foundation