Archive by Author

Sep 07
Carron-Concrete-pond

Visit the all new office and depot at 18 Elma Road Cheltenham.

Aug 05
Futuristic metal stamping plant. Machine installation

Carron Concrete Services was engaged by Dana to Design and Construct a fully integrated Building for this futuristic metal stamping plant. The new building is 1200 square meters in area, 15 meters in height, and a foundation pit  6 meters in depth. The building structure has crane rails for a twin 25 tonne crane of [...]

Aug 05
Futuristic metal stamping plant. Building construction

Carron Concrete Services was engaged by Dana to Design and Construct a fully integrated Building for this futuristic metal stamping plant. The new building is 1200 square meters in area, 15 meters in height, and a foundation pit  6 meters in depth. The building structure has crane rails for a twin 25 tonne crane of [...]

Aug 05
Futuristic metal stamping plant. Construction

Carron Concrete Services was engaged by Dana to Design and Construct a fully integrated Building for this futuristic metal stamping plant. The new building is 1200 square meters in area, 15 meters in height, and a foundation pit  6 meters in depth. The building structure has crane rails for a twin 25 tonne crane of [...]

Aug 05
Futuristic metal stamping plant. Excavation

Carron Concrete Services was engaged by Dana to Design and Construct a fully integrated Building for this futuristic metal stamping plant. The new building is 1200 square meters in area, 15 meters in height, and a foundation pit  6 meters in depth. The building structure has crane rails for a twin 25 tonne crane of [...]

Jul 08
Job-well-done-Crane-out

Tight squeeze for 100 tonne crane to leave site after erecting on site tilt up panels for 2 level office building in Richmond. A good operator, hydralic suspension and crab steering makes it possible.

Jul 08
Perimiter-drain2

Under  pinning to neighbours complete. blinding concrete poured, preparing base slab.

Jul 08
No-water-in-the-pit

Construction of 6 meter deep pit in unstable saturated sand with water table at 1.2 meters below ground level. No worries, we have the solutions as these photos show. Building an upside down pit. Construct the top 3 meters before you excavate the bottom 3 meters. No sign of water in pit, the de-watering working [...]

Jul 08
1-hectare-building-complete

Sheet metal slitting & cropping  line machine foundation for Toyota.

Jul 08
Bolt-hole-pockets-and-coolant-sumps

Excavation completed & pouring of 600 mm blinding concrete layer with super plasticiser.